|
Product Details
For best results clean all surfaces, to be free of Grease, algae.
Place sealer directly onto the surface you wish to bond/seal.
For bonding where there is movement (expansion & Contraction) of different substrates, leave a minimum 2mm thickness of bead between surfaces. Where there is livestock near the sealer, protect from ingestion While curing. Full cure 24 hours. Initial tack 2-3 hours. Can be painted over up to 4 hours.
For Clear Gold Sealer, leave a minimum 5mm bead between surfaces. ( MS Modified Polymer) For joining liner, use two beads 150mm apart and leave to cure for 36 hours at ambient temperature and for a patch, run a continuous bead around the edge of the patch and gently press into place. DO NOT PRESS FLAT.
Use a 5mm bead for optimum cure and bond strength. Initial cure 24 hours, continuing to harden up to 7 days. For use on concrete, first use a suitable primer.
|
|
|
© 2024 All Care Ponds
|
|
|
|
|
|
|
|
|